The 09-2X Continuous Action Tamper with dual tamping and aligning heads is the heart of the CAT surfacing gang. It is built by Plasseur Thuerer.         
Detail shots of entire gang tied down over the weekend during the second week of surfacing work on the WofA side.
Date: 3/31/2011 Location: Cusseta, AL   Map Show Cusseta on a rail map Views: 376 Collection Of:   Hank Stephens
Author:  Hank Stephens
The 09-2X Continuous Action Tamper with dual tamping and aligning heads is the heart of the CAT surfacing gang.  It is built by Plasseur Thuerer.
Picture Categories: This picture is part of album:  CSX CAT Tamper Gang on the AWP-WofA
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=2481324